--------Mould: 50% prepaid balance will be paid after sample approval, tooling lead time 45 days sample lead time 50 days; Tooling life is 50000shots.
--------Part: 50% before production, 50% after you receive the copy of B/L. Production Lead time: 30-45days.
Copyright © 2018 Hanway Metal Products Co.ltd. | All Rights Reserved Design by hanway.com.cn 粤ICP备17112456号